Bring actual products, production records and stock figures. They let your team test planning, material use, finished goods and costing as one complete workflow.
Quoted for your scope one-time module setup
Connect the production plan to materials, finished goods and cost. Check the whole job with the people who will run it.
See how we quote your implementationPrepare the records your factory uses
| Area | What to bring and confirm |
|---|---|
| Products and materials | Item codes, units, conversion factors and any batch or serial tracking. |
| Bills of materials | Approved components, quantities, subassemblies and the correct BOM for each product. |
| Operations and workstations | Production steps, routing, expected operation time and agreed costing rates. |
| Warehouses and opening stock | Where raw materials, work in progress, finished goods and scrap are held; checked quantities and values. |
| Planning and exceptions | How demand starts production, material shortages, partial completion, unused material and subcontracting where used. |
Test complete production jobs
ERPNext connects BOMs, production plans, work orders and job cards. Before go-live, run the agreed processes with your planners, stores team, operators and finance team.
- Plan a job for a named warehouse. Record physical stock and Projected Qty separately; the skip-available options use Projected Qty, which can include incoming orders.
- Issue materials, record operations and complete production, including partial completion where used.
- Account for returned materials, scrap or secondary outputs and subcontracted work where applicable.
- Check remaining materials, work in progress, finished-goods quantities and costs.
- Test required approvals and inspections; confirm who records each step and approves the result.
Scope the whole agreed workflow
Fullsend's Manufacturing module has no BOM-count cap. Accounting and Stock must work on the same ERPNext system. Select Quality separately when needed.
Test the complete workflow, including the source data and the result your team expects. Include the master and opening data your team will work with, plus any custom code, machine or tool connections and historical records the process depends on. The launch checks should reflect how the factory will actually work.
The Fullsend offering
One year of free AMC after go-live, including maintenance, changes and integrations. No separate change-request charges.
Bring a realistic starting brief
- Explain what you make, how orders trigger production and what currently causes delays.
- Bring representative BOMs, a completed production record and the reports your team needs.
- Identify a process owner and the people who will test and sign off the rollout.
Plan the implementation with Fullsend
Official references: ERPNext bills of materials · ERPNext production and material planning · ERPNext work orders and finished goods · ERPNext job cards and operation tracking
Make the production check measurable
Proposed pilot: choose one real BOM and a named warehouse. Agree expected quantities, costs and acceptable variances before posting. Record the installed version; ERPNext v16 uses Secondary Items where older examples show Scrap Items.
| Check | Record |
|---|---|
| Materials | Required, transferred, consumed, returned and remaining quantity by item |
| Output | Expected and recorded finished quantity, secondary output or scrap |
| Cost | Material and operation costs, unexplained difference and finance owner |
| Decision | Planner, stores and finance approval, with remaining blockers |
